What's Happening Now - November 4, 2020
Nov 4th, 2020
Crews use the “Jack & Bore” process to install a 24” waterline at Springhill Avenue.
Pipe boring is the method of installing pipes, cables or conduits underground which does not use trenches. Instead of opening up a trench, an auger drills a horizontal path below the surface of the ground.