Skip to main content

Awarded Bids

NUISANCE ABATEMENT - DEMOLITION OF STRUCTURE AT 2775 F/K/A 2773 SPRINGHILL AVENUE, MOBILE, AL 36607
Municipal Enforcement

Bid #: ME-056-21

Date Posted: Monday, May 16, 2022

Date Due: Monday, May 23, 2022

Time of bid opening: 2:30pm

CALL FOR BIDS



Project Name:         Nuisance Abatement – Demolition of Structure



Project Location:    2775 F/K/A 2773 Springhill Avenue



Mobile, Alabama 36607



Project Number:     ME-056-21



 



Notice is hereby given that the City of Mobile will receive sealed bids for the above stated project on Monday, May 23, 2022, no later than 2:15 local time.  Bidders shall insert sealed Bids into a receptacle, marked “City of Mobile Bids”, located in the elevator lobby outside the office of the City Clerk Office, 9th Floor South Tower, Government Plaza, 205 Government Street, Mobile, Alabama 36602.  The same will be publicly opened and read at 2:30 PM in the Atrium Lobby of Government Plaza.



A MANDATORY pre-bid conference shall be held at the project site, 2775 F/K/A 2773 Springhill Avenue at 9:00 AM local time on Tuesday, May 17, 2022.  Social distancing practices shall be observed, including the option of wearing of face coverings/masks by all participants. A representative of the Bidder must be in attendance throughout the meeting, and sign-in, in order to submit a bid for this project.   Bidders are required to participate in the Pre-Bid Conference, visit the site prior to submitting a Bid and include all costs associated with the project in their Bids.



Bid Documents are on file and may be examined and obtained from the following location:  Municipal Enforcement Department, 4851 Museum Drive, Mobile, Alabama 36608, 251-208-1540.



Ad will be advertised on Sunday, May 15, 2022.



 



Scope of WorkProvide all labor and materials required for an Asbestos Abatement of all asbestos-containing materials. The asbestos abatement shall be in accordance with United State Environmental Protection Agency (USEPA) and Alabama Department of Environmental Management (ADEM) regulations as indicated in the specification documents. Contractor shall conduct a full “Wet Demolition” in removing the structure including all contents inside and as described in the attached general notes and specifications provided, including all foundations, footings, slabs, etc. All demolition material and debris shall be sent to an approved Hazardous Landfill for Asbestos Containing Materials (ACM) and the demolition debris shall be sent to an approved Industrial and Construction and Demolition (C&D) Landfills. Disconnect and cap off all utility lines, such as sanitary sewer, water, and gas, in a manner satisfactory to the respective agency and the City of Mobile. Contractor shall clear lot by removing all debris resulting from the demolition of structure and all debris as designated in piles, scattered or otherwise on the site. Contractor is to provide Sediment and Erosion Control measures, grassing, and Best Management Practices for Demolitions where Asbestos Containing Materials and/or Lead-Based Paint may be present, per specifications. Submit before and after demolition pictures to City of Mobile Municipal Enforcement Department, along with waste shipment record, application and certification for payment and required close-out documents.


Please Click for File Attachment

Please Click for Addendum 1 Attachment

It is the responsibility of the BIDDER to check for, download and to include with their BID RESPONSE any and all ADDENDUMS that are issued for a specific BID issued by the City of Mobile. Failure to download and include ADDENDUM(s) in your BID RESPONSE may cause your bid to be rejected. This is a sealed bid. Any responses faxed or e-mailed will be rejected. This is a sealed bid. All responses must be submitted in a sealed envelope with the bid number on the outside of the envelope with the bid opening date. Any response that arrives improperly marked or with no bid number and opening date on the outside of the delivery or express package and opened in error will be rejected and not considered. It is the responsibility of the bidder to insure that their bid response is delivered to and received in the at the location or address specifically directed in the specification by the date and time prescribed.

Back to Bids